In this article, the last updated list of API and ISO standards for Gas Lift is presented. These standards can be considered as reference documents as well as a basis for training classes in the subject of Gas Lift.
Tag Archives: production surveillance
Gas lifted well: Operations & unloading process
Gas lift operations and unloading procedure are described in the following demonstration video:
In order to further explain all these aspects and more simplify the process, gas lift operations have been described in the next paragraphs:
CO2 Tracer Technology for Surveillance of Gas Lifted Wells
CO2 tracer technology is a low cost effective method to quikly and reliably check if a gas lifted well is producing at its optimum conditions.
Actually, the CO2 tracer survey would detect the operating lift depth, multiple points of injection, tubing leaks.