Guides to Flowing Gradient Survey Data from API RP 11 V5

The purpose of this article is to present rough guides, or “rules of thumb”, to consider when preparing a Flowing Gradient Survey job program for gas lifted well. These recommendations will guide Production Engineers when preparing the survey instruments, planning the survey stop depths and times, when planning to obtain the bottomhole pressure data, as well as when preparing the job program for running pressure & temperature survey.

 

Preparing the survey instruments:

  • Run sinker bars as needed to overcome pressure surges when entering the wellhead from the lubricator.
  • Sampling rate should be at 30-second intervals.
  • Calibrate the electronic gauge with its software prior to each use.

Continue reading

Depth Calculations

In the oil and gas industry, depth in a well is the measurement, for any point in that well, of the distance between a reference point or elevation, and that point. It is the most common method of reference for locations in the well, and therefore, in oil industry speech, “depth” also refers to the location itself.

Because wells are not always drilled vertically, there may be two “depths” for every given point in a wellbore: the measured depth (MD) measured along the path of the borehole, and the true vertical depth (TVD), the absolute vertical distance between the datum and the point in the wellbore. In perfectly vertical wells, the TVD equals the MD; otherwise, the TVD is less than the MD measured from the same datum. Common datums used are ground level (GL), drilling rig floor (DF), rotary table (RT), kelly bushing (KB) and mean sea level (MSL). [1]

Terms and Abbreviations:

The common references used in operations include:

  • Kelly Bushing Height (KB): The height of the drilling floor above the ground level. Many wellbore depth measurements are taken from the Kelly Bushing. The Kelly bushing elevation is calculated by adding the ground level to the Kelly bushing height.
  • Rotary Table (RT): e.g. MDBRT or TVDBRT. MDBRT stands for Measured Depth Below Rotary Table (MDBRT),
  • Rig Floor (RF),
  • Driller’s Depth below rotary table (DDbrt): The depth of a well or features within the wellbore as measured while drilling. The measured length of each joint of drillpipe or tubing is added to provide a total depth or measurement to the point of interest. Drillers depth is the first depth measurement of a wellbore and is taken from the rotary table level on the rig floor. In most cases, subsequent depth measurements, such as those made during the well completion phase, are corrected to the wellhead datum that is based on drillers depth (reference: Schlumberger Oilfield Glossary).
  • Ground Level (GL),
  • Casing Bowl Flange (CBF),
  • Tubing Hanger Flange (THF),
  • Mean Sea Level (MSL),
  • Subsea Level (SS),
  • Sea Bottom (SB),
  • Measured Depth (MD),
  • True Vertical Depth (TVD).

Continue reading

Tubing Specifications

Tubing is a relatively small-diameter pipe that is run into a well to serve as a conduit for the passage of oil and gas to the field surface facilities for processing. Tubing must be adequately strong to resist loads and deformations associated with production and workovers. Further, tubing must be sized to support the expected rates of production of oil and gas.

Tubing Specifications:

Tubing is specified by grade, outer diameter, weight, and connection. API tubing grades correspond to casing grades with the exception that P grade tubing has a tensile strength of 105,000 psi and is referred to as P105.

Continue reading

Artificial Lift Systems (ALS)- Selection criteria based on mechanical limits

By Marcelo Hirschfeldt, Instructor y Consultor en áreas de Tecnologías de Producción y Gerenciamiento de Activos Petroleros

Continue reading

Casing Specifications

Casing is the major structural component of a well. It is a tubular steel product used to line the wellbore (maintain borehole stability), prevent contamination of water sands, isolate water from producing formations, and control well pressures during drilling, production, and workover operations. Casing provides locations for the installation of blowout preventers, wellhead equipment, production packers, and production tubing.

The cost of casing is a major part of the overall well cost, so the selection of casing size, grade, connectors, and setting depth is a primary engineering and economic consideration.

Casing Strings:

Since the well is normally drilled in segments, multiple concentric casing strings are usually installed in the well. There are six basic types of casing strings:

Continue reading